The heat-insulated steel pipe 325/450 mm is designed for the construction of pipelines, heating networks, underground and above-ground (air) laying, transporting a coolant with a temperature of up to 150 ºС. The construction of heat pipelines from pre-insulated production pipes reduces the total costs for the estimated service life (30 years) by 6 times. Heat losses do not exceed 2% of the transported heat.
As a waterproofing shell for underground laying, pipes in polyurethane foam insulation in a polyethylene sheath, which is made of low-pressure polyethylene, are used. For external (air) laying, spiral-lock pipes are used in polyurethane foam insulation in a galvanized sheath made of galvanized steel tape.
The use of pipes pre-insulated with polyurethane foam (heat-insulated pipes) gives:
1. Extending the service life of the pipeline up to 30 - 40 years.
2. Reduced heat loss by 10 times (up to 2%).
3. Reducing construction time by 2 - 5 times.
4. Reducing capital costs by 15 - 20% (no need to build channels, chambers for the installation of valves).
5. Reduced repair costs by 3 times.
6. Reduced operating costs by 9 times.
You can buy the Steel pipe heat-insulated 325/450 mm from us at the best price in Ukraine. A wide range of products allows us to quickly and efficiently fulfill any order, helping to complete any construction work on time.
No questions about this product, be the first and ask your question.